Site preparation for the construction of Cyprus Electricity Authority Vasilikos Power Plant. Soil decontamination/ neutralization of acid (spilled by nearby fertilizer factory), excavation and removal of the order of 3,500,000 m3 within 4 months, construction of roads, drainage, oil interception system, irrigation pond, and landscaping.